About Glass Tile

OVERVIEW INSTALL MAIN BACK 18 OF 18

image

Curing the grout
Grout should be damp cured for at least seven days before the tiles are subjected to physical impact - in the case of glass floor tile, this includes construction traffic of any kind. If the installation is a submerged or heavy water-use application, such as spas and swimming pools, the grout should cure 21 days before use.
For more information, consult our Installation/Technical page.
Information on these pages is offered as a background and guideline. No warranty is implied. Always consult manufacturer instructions.

Installation Articles

Photo Tutorials

Photo Tutorials

Installation Articles

Other Articles